Inquiry – execution of the lightning protection design

Communication Equipment Factory “PZL-KALISZ” S.A. based in Kalisz informs that in the procedure No. 10 / EN / WSK / 2020 of February 17, 2021 for “Construction of two MV 15kV cable lines from substations P6 and P8 to GPZ Piwonice and construction of a supply loop along the same route through the connecting P3 station P6 and P8 stations with a cable line type 3x XRUHAKXS 1x 240 mm2 with a voltage of 15kV “, the company’s offer was selected:

ENERGETIK Andrzej Kowalczyk Katarzyna Młynarczyk S.C., Maciszewice 42, 98-235 Błaszki – download file

współpracujemy :